D-Park Tsuen Wan ​

The Project: D-Park, Tsuen Wan

Client: Discovery Park Commercial Services Ltd

Year: 2020

The Challenge

The situation calls for a past midnight installation as the power supply had to be shut down in order to install a switch in the main switch room. At the same time, we had to meet a very tight deadline to get everything done. During our inspection we also discovered that the partition wall where we were to mount our Slate chargers was hollow.

The Solution

Our project team with ‘all can do’ mindset resolved these by having a well thought out pre-installation planning with our client’s team. We were prepared to work with longer hours and put in extra manpower to meet our client’s deadline and to ensure on timeliness working through past midnights. To ensure the chargers could be installed securely, we resolved by building special design brackets to make it sturdy and extra safe. We applied energy charge system at this site. Please refer to our payment system for various payment options.

 

 

omar prestwich MiJXjRxkueI unsplash scaled
The Highlights

Energy charge based on the kWh used, the most fair way to charge.
High power medium charging up to 21kW
Comprehensive payment system through EnerPay

omar-prestwich-MiJXjRxkueI-unsplash
brooke-cagle-yBAhjzfr0xk-unsplash
troy-t-YoGzQqqWZP0-unsplash
tim-smurf-TS8kaOh96xs-unsplash

Re-energise your life get in touch today